shopify
site analytics
acetic acid plant explosion
anhydrous ammonia training power plan
pipeline leak vacuum extraction
pipeline leak location, cleanup, and repair
latex pond chemical fixation and conversion to parking lot
superfund site groundwater treatment plant

24 Hr Emergency Response

800-377-3648

(placeholder)
(placeholder)

6,000 Environmental Remediations Since 1975

Remtech © 2017

Automated Sluice Gate Installed in Weir Box
Weir Box with Automated Gate and Hydrocarbon Sensor 
Installed at St. Louis Yard


Locations:  Alabama, Kentucky, Missouri, North Carolina, Ohio, South Carolina, Virginia, West Virginia

Client: Major Railroad

Contract Amount: $1,560,000+



PROBLEM


Remtech was authorized by a major railroad to construct secondary containment and pollution prevention and control systems at railyards in eight states.


SOLUTION


Pollution prevention and secondary containment facilities constructed or installed by Remtech consisted of:


➣ Earth/Rock Containment and Contact Water Diversion Swales

➣ New Manholes & Connecting Piping

➣ Concrete Containment Dikes, Curbs & Headwalls

➣ Stormwater Containment Underflow Weirs with Automated Sluice Gates

➣ Footings and Columns for Overhead Fuel Pipe Bridges

➣ Split Casing Secondary Containment Piping

➣ Automated Fuel Control Valves with Leak Detection

➣ Hydrocarbon Sensors

➣ Control Valves & Pumps

➣ Protective Bollards & Access Grates

➣ Bank Stabilization & Erosion Control

➣ Protective Coatings


COST/BENEFITS


50,000 lb reinforced precast concrete underflow weir boxes and bases were fabricated at Remtech's facility in Atlanta and shipped up to 600 miles. The pre-fabricated boxes were lowered into excavations inside trench boxes. Fabrication of pre-cast structures was considerably less expensive than

forming and installing onsite.

Weir Box with Automated Gate and Hydrocarbon Sensor

Installed at St. Louis Yard

Pollution Prevention Stormwater Weir Box with Slide Gate

Automated Slide Gate Installed in Weir Box

Split Casing Secondary Containment Installed On Fuel Line Crossing Stream in Alabama
Weir Box with Automated Gate Installed at South Carolina Yard
Overhead Pipe Supports & Split Cassing Installed at West Virginia Yard
Construction of Road, Fuel Pipeline with Secondary
Containment & Supports, Curbing & Weir Box
Automated Fuel Valve with Leak Detection
Installed at Kansas City Yard

Weir Box with Automated Gate Installed at South Carolina Yard

Construction of Road, Fuel Pipeline with Secondary

Containment & Supports, Curbing & Weir Box

Overhead Pipe Supports & Split Cassing Installed at West Virginia Yard

Automated Fuel Valve with Leak Detection

Installed at Kansas City Yard

Split Casing Secondary Containment Installed On Fuel Line Crossing Stream in Alabama

Hydrocarbon Sensor Installation in Weir Box

Hydrocarbon Sensor Installation in Weir Box

Pre-Cast 50,000 lb Weir Box Loaded from Remtech's Facility and Transported up to 600 Miles for Installation

Pre-Cast 50,000 lb Weir Box Loaded from Remtech's Facility and Transported up to 600 Miles for Installation

Automated Sluice Gate, Hydrocarbon Sensor, & Control Box Installed in Weir Box

Automated Sluice Gate, Hydrocarbon Sensor, & Control Box Installed in Weir Box

Secondary Containment Pollution Prevention Systems Installed in Eight States

Web Inquiries: 770-427-7766 Extension 4

Fax: 770-427-7001

Email: webmaster@remtech-eng.com

Copyright Remtech Engineers, 2017

Remtech EngineersTM

200 Cobb Parkway North

Suite 208

Marietta, Georgia 30062

Phone: 770-427-7766 or 800-377-3648

(placeholder)
(placeholder)

REMTECH SERVICES

(placeholder)