- HOME |
- About Us |
- Services |
- Spill Response and Emergency Response
- Disaster Response and Recovery
- Vacuum Truck Services
- Tank Cleaning, Confined Space, Industrial Maintenance
- Environmental Remediation and Cleanups
- Remedial Design and Construction
- Groundwater Vacuum Extraction
- Sewer & Pipeline Cleaning
- Combustible Dust Cleaning & Hazard Analysis
- Combustible Metal Dust Cleaning & Hazard Analysis
- Homeless Encampment Cleanups
- Landfill Maintenance and BioMass to Energy
- Mobile Wastewater Treatment
- PFAS Treatment & Rapid PFAS Testing
- PFAS Stormwater Treatment
- Spill Prevention
- Waste Managemen and Waste Disposal
- Waste Management Waste Treatment
- Stormwater Facility and Pond Management
- Mercury Remediation
- Mold Abatement Due Diligence
- Mold Remediation and Mold Testing
- Lead Paint Remediation
- Asbestos Remediation
- Fall Protection & Loading Racks
- Demolition and Restoration
- Environmental Consulting
- Environmental OSHA, EPA, DOT Training
- Covid-19 Decontamination
- METHANE PRODUCTION TESTS FROM MANURE
- Bioremediation |
- Bioremediation Optimization Primer
- Biopile Optimization Primer with HC2000
- Bioremediation Accelerator HC2000
- Bioremediation White Paper with HC2000
- Bioremediation Degradation Curves
- Bioremediation Efficacy Testing
- Bioremediation Toxicity Testing
- Diesel LUST Site Bioremediation
- Diesel Bioremediation of LUST Site
- Solvent Site Bioremediation with HC-2000
- Gasoline LUST Site Bioremediation
- Gasoline LUST BioSparge
- Jet Fuel Riverbank Bioremediation
- Gasoline Wetland Bioremediation
- Jet Fuel Bioremediation
- Transformer Oil Fire Bioremediation
- Substation Fire Bioremediation
- Diesel and Sediment Bioremediation
- Soy Protein Bioremediation
- Diesel Track Ballast Bioremediation
- Diesel Track Siding Bioremediation
- Diesel Mainline Track Bioremediation
- Lube Oil Track Bioremediation
- Waste Oil Mainline Tracks Bioremediation
- Diesel Spill Railyard Track Bioremediation
- Industries Served |
- Railroad Environmental Services
- Transportation Environmental Services
- Power Industry Environmental Services
- Agriculture and Food Environmental Services
- Chemical, Petrochemical, Petroleum Manufacturing Environmental Services
- Pipeline, Terminal, Refinery Environmental Services
- Renewable Energy & Landfill Services
- Military & Aerospace Environmental Services
- Coal Industry Environmental Services
- Case Histories |
- Railyard Pipeline Spill Bioremediation
- Frac Tank Wastewater Treatment Plant
- PFAS Treatment Chemical Plant Fire
- Railyard Secondary Containment Systems
- Pipeline Cleaning at Railyard
- Gasoline Remediation in Fractured Rock
- Latex Fixation at Carpet Plant
- Arsenic Remediation at Foundry Site
- Groundwater Treatment at Superfund Site
- Chemical Plant Fire Remediation
- Gasoline Tanker Fire Emergency Response
- Remediation of Closed Hospital
- Electric Control Center Fuel Remediation
- Chlorine Tankcar Leak Stopped
- Chlorine Dioxide Explosion Remediation
- TDI Removed from pMDI Unloading System
- Substation Transformer Explosion Remediation
- Power Plant Transformer Explosion Remediation
- Mercury Decontamination at Hydro Plant
- Lubricant Tanker Loading Rack Design
- Railcar Ethanol Unloading Rack Design
- Train Fire Root Cause Investigation
- UST Tank Failure Investigation
- Downloads |
- News |
- FRACAIR / SALES
PROBLEM
Remtech Engineers was engaged to close three latex ponds.
Concern was expressed by the client that the latex may contain
hazardous chemicals.
LATEX WASTE CHEMICAL FIXATION SOLUTION
Remtech conducted a site characterization of the SBR Latex in the
ponds that confirmed that a potential for HSRA chemicals over
reporting triggers may be present.
Analysis of bench-scale chemically fixed and aerated latex waste
samples did not contain hazardous chemicals indicating that the heat
of hydration of chemical fixation with cement kiln dust and Portland
Cement and air stripping was an effective treatment methodology.
This treatment methodology removed 99% of phthalates,
formaldehyde, and other volatile organic compounds. In addition, the
compressive strength of the treated waste was sufficient to be used as
a compatible backfill for construction of a parking lot at the site.
8,000 tons of latex sludge were dewatered and leachates
treated with Remtech’s mobile treatment system. The 100-gallon per
minute treatment system consisted of a 10,000-gallon clarifier followed by a Low-Profile Air Stripper, diatomaceous earth and activated carbon filters. Over 460,000 gallons of pond leachates were treated below detection limits for volatile and semi-volatile organics and discharged to the City’s sanitary sewer system.
Latex sludges were chemically fixed and then placed on inclined
dewatering beds and degassed with hot air on biobeds constructed
over perforated piping in three foot lifts. The stabilized material was
used for backfill for construction of a parking lot on site. Compaction ratios
greater than 90% were achieved. An asphalt cap was used as a final
cover.
LATEX WASTE CHEMICAL FIXATION COST/BENEFITS
Converting potentially hazardous latex waste insitu into a usable
backfill material for construction of a parking lot saved the client
several hundred thousand dollars compared to excavation, transport,
disposal, and backfill.