- HOME |
- About Us |
- Services |
- Spill Response and Emergency Response
- Disaster Response and Recovery
- Vacuum Truck Services
- Tank Cleaning, Confined Space, Industrial Maintenance
- Environmental Remediation and Cleanups
- Remedial Design and Construction
- Groundwater Vacuum Extraction
- Sewer & Pipeline Cleaning
- Combustible Dust Cleaning & Hazard Analysis
- Combustible Metal Dust Cleaning & Hazard Analysis
- Homeless Encampment Cleanups
- Landfill Maintenance and BioMass to Energy
- Mobile Wastewater Treatment
- PFAS Treatment & Rapid PFAS Testing
- PFAS Stormwater Treatment
- Spill Prevention
- Waste Managemen and Waste Disposal
- Waste Management Waste Treatment
- Stormwater Facility and Pond Management
- Mercury Remediation
- Mold Abatement Due Diligence
- Mold Remediation and Mold Testing
- Lead Paint Remediation
- Asbestos Remediation
- Fall Protection & Loading Racks
- Demolition and Restoration
- Environmental Consulting
- Environmental OSHA, EPA, DOT Training
- Covid-19 Decontamination
- METHANE PRODUCTION TESTS FROM MANURE
- Bioremediation |
- Bioremediation Optimization Primer
- Biopile Optimization Primer with HC2000
- Bioremediation Accelerator HC2000
- Bioremediation White Paper with HC2000
- Bioremediation Degradation Curves
- Bioremediation Efficacy Testing
- Bioremediation Toxicity Testing
- Diesel LUST Site Bioremediation
- Diesel Bioremediation of LUST Site
- Solvent Site Bioremediation with HC-2000
- Gasoline LUST Site Bioremediation
- Gasoline LUST BioSparge
- Jet Fuel Riverbank Bioremediation
- Gasoline Wetland Bioremediation
- Jet Fuel Bioremediation
- Transformer Oil Fire Bioremediation
- Substation Fire Bioremediation
- Diesel and Sediment Bioremediation
- Soy Protein Bioremediation
- Diesel Track Ballast Bioremediation
- Diesel Track Siding Bioremediation
- Diesel Mainline Track Bioremediation
- Lube Oil Track Bioremediation
- Waste Oil Mainline Tracks Bioremediation
- Diesel Spill Railyard Track Bioremediation
- Industries Served |
- Railroad Environmental Services
- Transportation Environmental Services
- Power Industry Environmental Services
- Agriculture and Food Environmental Services
- Chemical, Petrochemical, Petroleum Manufacturing Environmental Services
- Pipeline, Terminal, Refinery Environmental Services
- Renewable Energy & Landfill Services
- Military & Aerospace Environmental Services
- Coal Industry Environmental Services
- Case Histories |
- Railyard Pipeline Spill Bioremediation
- Frac Tank Wastewater Treatment Plant
- PFAS Treatment Chemical Plant Fire
- Railyard Secondary Containment Systems
- Pipeline Cleaning at Railyard
- Gasoline Remediation in Fractured Rock
- Latex Fixation at Carpet Plant
- Arsenic Remediation at Foundry Site
- Groundwater Treatment at Superfund Site
- Chemical Plant Fire Remediation
- Gasoline Tanker Fire Emergency Response
- Remediation of Closed Hospital
- Electric Control Center Fuel Remediation
- Chlorine Tankcar Leak Stopped
- Chlorine Dioxide Explosion Remediation
- TDI Removed from pMDI Unloading System
- Substation Transformer Explosion Remediation
- Power Plant Transformer Explosion Remediation
- Mercury Decontamination at Hydro Plant
- Lubricant Tanker Loading Rack Design
- Railcar Ethanol Unloading Rack Design
- Train Fire Root Cause Investigation
- UST Tank Failure Investigation
- Downloads |
- News |
- FRACAIR / SALES
Location: Atlanta, Georgia
Client: County Government
Contract Amount: $170,000
PROBLEM
A county purchased one of the oldest historical foundry and machining manufacturing sites (11.2 acres) in Georgia for the development of a county services complex. A Phase I Environmental Assessment was conducted by a private consultant who reported no environmental risks. A second
firm identified significant environmental hazards/risks and recommended supplemental investigations.
Construction contracts were let and demolition commenced before additional investigations were conducted. Multiple explosions ensued and construction was halted.
FOUNDRY ARSENIC REMEDIATION SOLUTION
Remtech Engineers was authorized to mitigate and identify the explosive material. The material was determined to be calcium carbide formerly used to generate acetylene.
Remtech’s authorization was expanded to assist the County Board of Commissioners with completing a Phase II and III Environmental Assessment. A myriad of environmental issues were successfully addressed that resulted in completion of the project with minimal contractor delays.
Remtech prepared and implemented a site remediation plan which addressed several innovative factors:
• Identification of hazardous materials & unknowns
• Disposal of hazardous materials and wastes
• Onsite destruction of unstable/explosive compounds
• Recovery of recyclable materials
• Background arsenic in soils linked to Appalachia coal
• Worked with ATF to identify suspect civil war ordnance
• Soil & groundwater sampling
• Identification & remediation of underground tankage
• Coordination of construction activities with site remediation
• Industrial hygiene monitoring of construction workers
• Capped site & controlled arsenic exposure pathways
FOUNDRY ARSENIC REMEDIATION COST/BENEFITS
Prepared HSRA notification & mitigation within 30 day period - prevented site listing, associated costs and liabilities, and allowed construction with existing contractor to complete project with minimal delays.