shopify
site analytics
acetic acid plant explosion
anhydrous ammonia training power plan
pipeline leak vacuum extraction
pipeline leak location, cleanup, and repair
latex pond chemical fixation and conversion to parking lot
superfund site groundwater treatment plant

24 Hr Emergency Response

800-377-3648

(placeholder)
(placeholder)

6,000 Environmental Remediations Since 1975

Remtech © 2018

| CAREERS |

VacuJet Setup At Extraction Point


▶︎ Liquid Smoke Testing

▶︎ Conductive & Inductive Tracing

▶︎ Ground Penetrating Radar


▶︎ Video Sewer & Pipeline Inspection

▶︎ Leak Detection

▶︎ Hydrostatic & Pressure Testing

▶︎ Speciality Gas Testing


▶︎ Sewer and Pipeline Jetting

▶︎ Hydrojetting

▶︎ Pigging Lines

▶︎ Vacujetting Heavy Solids

▶︎ Manhole & Catch Basin Cleaning

▶︎ Drain Cleaning


▶︎ Pipelines

▶︎ Wastewater Sewers

▶︎ Stormsewer Construction

▶︎ Manhole Construction

▶︎ Automated Sluice Gates

▶︎ Stormwater Pollution Prevention Systems

Remtech's sewer cleaning, location, inspection, and construction group has located, cleaned, and installed stormwater and wastewater management systems for major railroad, chemical, and manufacturing clients.  Segregation of process from clean stormwater is one of the most important elements in complying with stormwater pollution prevention regulations.

Environmental releases may be conveyed through unknown cross connections with stormsewers, leaking process or wastewater lines.  

A leaking fuel pipeline at an intermodal railyard was located using ground penetrating radar, and inductive/conductive tracing.  The cased fuel carrier pipe cross connection with a stormsewer was documented by video inspection and isolated employing 30" inflatable plugs.  The stormsewer cross connection was uncovered and isolation valves were installed at two locations to facilitate pressure testing of carrier pipe segments to locate the leak point. The leaking pipeline was located over 15 feet below grade requiring large access pits to install the isolation valves.  Over 1 millions gallons of contact water and stormwater had to be collected and treated to dewater the pits.  The lines were cleaned by pigging and the damaged pipe system was replaced, tested, and x-rayed to verify the integrity of welds.  Groundwater remediation systems were installed in the test pits for total fluids extraction.

Heavy deposits consisting of sand, lube oil, and other grease are difficult to remove by conventional jetting.  Remtech developed an integrated vacuum and jetting pipe cleaning process VacuJet that cleans large pipes over long distance.  A jetting nozzle breaks up debris that is evacuated through a 300 ft 3" or 4" vacuum line moved through the sewer by a glide/pulley system and deposited in a vacuum box for disposal.

Liquid Smoke Generator Locates Stormsewers
Smoke Testing Locates Unknown Drop Inlet
Oily Sandy Deposits Prior to VacuJetting
Fuel Leak Documented by Video Inspection
VacuJet Process Schematic
VacuJet Clears Oily Debris From 24
Pipeline Pig Purging Prior to Testing

Pipeline Pig Purging Prior to Testing

Stormwater Weir Box with Slide Gate
Weir Box with Automated Sluice Gate Installed at South Carolina Yard

Smoke Testing Locates Unknown Drop Inlet

Liquid Smoke Generator Locates Stormsewers

SEWER CLEANING, PIPELINE CLEANING, LOCATING, INSPECTION, & CONSTRUCTION

(placeholder)
(placeholder)

REMTECH SERVICES

(placeholder)

200 Cobb Parkway North

Suite 208

Marietta, Georgia 30062

Phone: 770-427-7766 or 800-377-3648  Fax: 770-427-7001

Copyright Remtech Engineers, 2018

Sewer Locating, Sewer Smoke Testing

Sewer Locating & Testing

Sewer Cleaning, Pipeline Cleaning

Sewer Construction, Pipeline Construction