shopify
site analytics
acetic acid plant explosion
anhydrous ammonia training power plan
pipeline leak vacuum extraction
pipeline leak location, cleanup, and repair
latex pond chemical fixation and conversion to parking lot
superfund site groundwater treatment plant

24 Hr Emergency Response

800-377-3648

(placeholder)
(placeholder)

6,000 Environmental Remediations Since 1975

Remtech © 2017

HC-2000 Motor Oil Bioremediation Track Siding

Web Inquiries: 770-427-7766 Extension 4

Fax: 770-427-7001

Email: webmaster@remtech-eng.com

Copyright Remtech Engineers, 2017

Remtech EngineersTM

200 Cobb Parkway North

Suite 208

Marietta, Georgia 30062

Phone: 770-427-7766 or 800-377-3648

(placeholder)
(placeholder)

REMTECH SERVICES

(placeholder)

Location:  Atlanta, Georgia

Client:  Lubricant Manufacturer

Contract Amount:  $26,000


PROBLEM


A major lubricant company contracted with Remtech Engineers to update their SPCC plan and bioremediate an active rail siding track for a motor oil formulation plant in Atlanta, Georgia.


SOLUTION


Railcar unloading pumps were moved inside the secondary containment area for the bulk storage tank farm.  


Remtech’s native bioremediation accelerator HC-2000 was used to degrade over 30 years of oil deposits on the rail siding.


During a four (4) month treatment period, total petroleum hydrocarbons were reduced by over 60%.  


During the treatment program, additional oil releases were observed during unloading operations and from runoff from tank car overfills

by the shipper.  


A trackmat changeout program was implemented to minimize future oil spill buildup on the rail siding.  The shipper was required to clean off cars prior to transport.  


COST/BENEFITS


Ballast insitu treatment with HC-2000 allowed the facility to continue operations without interruptions saving thousands in lost track time. The mobile phase of residual oil and resulting sheens was eliminated and confined to the rail siding.

Oil Contaminated Track Siding Prior to Treatment

Oil Contaminated Track Siding Prior to Treatment
Oil Contaminated Track Siding Following Four Months of HC-2000 Treatment