shopify
site analytics
acetic acid plant explosion
anhydrous ammonia training power plan
pipeline leak vacuum extraction
pipeline leak location, cleanup, and repair
latex pond chemical fixation and conversion to parking lot
superfund site groundwater treatment plant

24 Hr Emergency Response

800-377-3648

(placeholder)
(placeholder)

6,000 Environmental Remediations Since 1975

Remtech © 2017

Solution Phase Analytes Reduced an 
Average of 80% in 
14 Days



Location: Middle Georgia

Client: Pre-Cast Manufacturer

Contract Amount: $45,000


PROBLEM


A 22-acre precast concrete manufacturing property was sold to another party when it was discovered that USTs had not been removed.  Remtech was engaged to investigate and remediate the problem and obtain a no further action letter from the State for the new property owners.


SOLUTION


Two fiberglass composite steel tanks were discovered that were installed in 1991.  Both tanks, pump island, and boiler feed line were removed and soil and groundwater monitoring wells were installed.  


Free product thickness exceeding several inches was discovered in several of the wells.  A slug test was run on MW-1 using Bouwer-Rice (Aqtesolv). The conductivity was determined to be 2.2102 x 10-4 ft/min (1.068 x 10-4 cm/sec).


Subsurface soils consisted of red and tan silty clays to tan and brown saprolites that extended to a maximum explored depth of  29 ft.  Groundwater was encountered at a depth of approximately 20 ft BLS.  Zone of influence tests confirmed connectivity distances to be 25 ft.  


Two HC-2000 injection events into four wells followed by a water chase occurred over a two week period. Total fluids extraction was performed using Remtech’s JetVac dual phase vacuum extraction system.


COST/BENEFITS


Within a period of five weeks, free product thicknesses, BTEX, and PAHs concentrations were reduced below State limits and a no further action letter was issued by the State.

Remtech JetVac Dual Phase Vacuum Extraction System

HC-2000 Remediation of LUST Site After Property Sale

Web Inquiries: 770-427-7766 Extension 4

Fax: 770-427-7001

Email: webmaster@remtech-eng.com

Copyright Remtech Engineers, 2017

Remtech EngineersTM

200 Cobb Parkway North

Suite 208

Marietta, Georgia 30062

Phone: 770-427-7766 or 800-377-3648

(placeholder)
(placeholder)

REMTECH SERVICES

(placeholder)
HC-2000 Injection Operations
Remtech JetVac Dual Phase Vacuum Extraction System

HC-2000 Injection Operations

Solution Phase Analytes Reduced an

Average of 80% in

14 Days