Location: Atlanta, Georgia

Client: Major Beverage Distribution Facility

Contract Amount: $250,000

HC-2000 Biosparge Wells
HC2000 BioFoam Injection Cross Section
Bio-Foam Injection Well
HC2000 BTEX Degradation Curve
HC2000 TPH Degradation Curve

BTEX Degradation Curve

TPH Degradation Curve


A gasoline contaminated site at a beverage distribution facility with leaking underground storage tanks was qualified by Remtech for reimbursement under the State GUST Trust Fund.


The USTs were removed and a bioventing/biosparge system was installed. Seven (7) existing recovery wells were converted into HC-2000 injection bio-foam wells. Remtech’s HC-2000 (natural bioremediation accelerator) was injected over a six (6) month period.

Remtech’s bio-foam injection wells were utilized to increase mass transport of HC-2000 to the saturated and unsaturated zones. High pressure air is used to generate foam micro bubbles. High volume/low pressure air was used to move the foam blanket through the unsaturated zone and capillary



Remtech qualified this site for reimbursement under the State GUST Trust Fund.

Bio-Foam Injection Well

HC-2000 Biosparge Wells

HC-2000 Accelerated Gasoline Lust Site BioSparge Remediation




200 Cobb Parkway North

Suite 208

Marietta, Georgia 30062

Phone: 770-427-7766 or 800-377-3648  Fax: 770-427-7001

Copyright Remtech Engineers, 2018