Division of SET Environmental
10,000 Environmental Remediations Since 1975
24 Hr Emergency Response
800-377-3648
| Contact Us | Careers | Employees
- HOME
- About Us
- Services
- Environmental Remediation Services
- Remediation Engineering Contracting
- Emergency Spill Response & Cleanup
- Disaster Response
- Industrial Vacuum Truck & Emergency Recovery Services
- Tank Cleaning & Industrial Services
- Waste Management & Disposal
- Mobile Wastewater & Remediation Systems
- Stormwater Basin Management & Inspections
- Environmental Engineering Services
- Groundwater & Soil Remediation
- Asbestos & Mold Remediation
- Mercury Remediation
- Chemical Fixation & Solidification
- Combustible Dust Cleanup & Hazard Analysis
- Metal Dust Cleaning & Hazard Analysis
- Homeless Encampment Cleanups
- PFAS Treatment Systems
- Lead Paint Abatement
- OSHA and EPA Training
- Sewer Jetting VACUJET and Inspection Services
- Spill Prevention & Secondary Containment
- Loading Rack Fall Protection, Walkways & Catwalks
- Renewable Energy Engineering
- Demolition & Site Restoration
- Bioremediation
- Bioremediation Optimization Primer
- Biopile Optimization Primer
- Bioremediation Accelerator HC-2000
- Bioremediation White Paper
- Bioremediation Degradation Curves
- Bioremediation Efficacy Testing
- Biorediation Toxicity Testing
- Diesel Bioremediation with Dual Phase Extraction
- Bioremedation of River Bank Jet Fuel
- Bioremediation of Gasoline in Wetland
- Biosparge of Solvent Site
- Bioremediation of Airport Jet Fuel Spill
- Detention Pond Diesel Bioremediation
- Bioremediation of Diesel on Mainline Track
- Bioremediation of Diesel Track Collision Site
- Bioremediation At-Grade Collison Site
- Bioremediation of Waste Oil
- Bioremediation of Transformer Oil
- Industries Served
- Case Histories
- Temporary Food Wastewater Treatment Plant
- Landfill Leachate Treatment Plant Design
- Diesel Fuel Dual Phase Extraction
- Gasoline Remediation in Fractured Rock
- Chlordane Superfund Site Remediation
- Agricultural Chemical Fire Response and Remediation
- PFAS Mobile Treatment Systems
- PFAS Treatment at Chemical Plant Fire
- Leaking Fuel Pipeline Remediation
- Spill Prevention at Railyards
- Railcar Loading RacK Design
- Leaking Chlorine Railcar Capped
- Chlorine Dioxide Explosion Remediation
- Vacujet Heavy Solids Sewer Cleaning
- Clemical Plant Fire Response and Remediation
- Train Fire Investigation
- Arsenic Building Site Remediation
- Chemical Fixation of Carpet Latex Sludge
- Power Center Fuel Remediation
- Power Plant Transformer Fire Remediation
- Transformer Explosion Remediation
- Mercury Hydroelectric Plant Remediation
- Decontamination of Abandoned Hospital
- Toluene Diisocyanate Remediation
- Loading RacK Tanker Unloading Design
- UST Tank Failure Investigation
- Gasoline Tanker Fire Emergency Response
- Publications
- TREATMENT & EQUIPMENT SALES
Toluene Diisocyanate Remediation from pMDI Contaminated Tank and Process Lines
Location: Central Georgia
Client: Major Chemical Company
Contract Amount: Confidential

TDI Unloaded into pMDI Tank Causing Contamination of Storage Tank and Process Lines
TDI PROCESS CONTAMINATION PROBLEM
A railcar of toluene diisocyanate (TDI) was mistakenly shipped as pmethylene diphenyl diisocyanate (MONDUR 489, pMDI) to a chemical manufacturing company and unloaded into their receiving tank. TDI froze in the unloading lines and transfer pump. Note (TDI freezes at 50oF and pMDI at 32oF). Ambient temperatures during the transfer ranged from 23 to 30oF.
TOLUENE DIISOCYNATE REMEDIATION SOLUTION
Remtech was engaged to remove the frozen TDI from the railcar’s standpipe and receiving facility’s lines, pump, and storage tank and restore normal operating conditions to the plant as soon as possible.
Drum heaters, heat tape, and steam were applied to external lines to thaw the frozen product. After 48 hours of heating, TDI was drained from the transfer lines.
Product was pumped and pneumatically transferred from the storage tank and lines to two tankers with off-gas vapors treated by two (2) Remtech off-gas carbon filtration systems connected in series. 65,000 lbs of TDI were removed from the system and transferred into two stainless steel tankers.
TOLUENE DIISOCYNATE REMEDIATION COST/BENEFITS
The frozen TDI was removed from fill lines, pump and tankage without system dissembling or rodding within 48 hours. Thawing and purging frozen TDI in place significantly reduced costs and time that this facilities unloading facility was out of service.