Division of SET Environmental
10,000 Environmental Remediations Since 1975
24 Hr Emergency Response
800-377-3648
| Contact Us | Careers | Employees
- HOME
- About Us
- Services
- Environmental Remediation Services
- Remediation Engineering Contracting
- Emergency Spill Response & Cleanup
- Disaster Response
- Industrial Vacuum Truck & Emergency Recovery Services
- Tank Cleaning & Industrial Services
- Waste Management & Disposal
- Mobile Wastewater & Remediation Systems
- Stormwater Basin Management & Inspections
- Environmental Engineering Services
- Groundwater & Soil Remediation
- Asbestos & Mold Remediation
- Mercury Remediation
- Chemical Fixation & Solidification
- Combustible Dust Cleanup & Hazard Analysis
- Metal Dust Cleaning & Hazard Analysis
- Homeless Encampment Cleanups
- PFAS Treatment Systems
- Lead Paint Abatement
- OSHA and EPA Training
- Sewer Jetting VACUJET and Inspection Services
- Spill Prevention & Secondary Containment
- Loading Rack Fall Protection, Walkways & Catwalks
- Renewable Energy Engineering
- Demolition & Site Restoration
- Bioremediation
- Bioremediation Optimization Primer
- Biopile Optimization Primer
- Bioremediation Accelerator HC-2000
- Bioremediation White Paper
- Bioremediation Degradation Curves
- Bioremediation Efficacy Testing
- Biorediation Toxicity Testing
- Diesel Bioremediation with Dual Phase Extraction
- Bioremedation of River Bank Jet Fuel
- Bioremediation of Gasoline in Wetland
- Biosparge of Solvent Site
- Bioremediation of Airport Jet Fuel Spill
- Detention Pond Diesel Bioremediation
- Bioremediation of Diesel on Mainline Track
- Bioremediation of Diesel Track Collision Site
- Bioremediation At-Grade Collison Site
- Bioremediation of Waste Oil
- Bioremediation of Transformer Oil
- Industries Served
- Case Histories
- Temporary Food Wastewater Treatment Plant
- Landfill Leachate Treatment Plant Design
- Diesel Fuel Dual Phase Extraction
- Gasoline Remediation in Fractured Rock
- Chlordane Superfund Site Remediation
- Agricultural Chemical Fire Response and Remediation
- PFAS Mobile Treatment Systems
- PFAS Treatment at Chemical Plant Fire
- Leaking Fuel Pipeline Remediation
- Spill Prevention at Railyards
- Railcar Loading RacK Design
- Leaking Chlorine Railcar Capped
- Chlorine Dioxide Explosion Remediation
- Vacujet Heavy Solids Sewer Cleaning
- Clemical Plant Fire Response and Remediation
- Train Fire Investigation
- Arsenic Building Site Remediation
- Chemical Fixation of Carpet Latex Sludge
- Power Center Fuel Remediation
- Power Plant Transformer Fire Remediation
- Transformer Explosion Remediation
- Mercury Hydroelectric Plant Remediation
- Decontamination of Abandoned Hospital
- Toluene Diisocyanate Remediation
- Loading RacK Tanker Unloading Design
- UST Tank Failure Investigation
- Gasoline Tanker Fire Emergency Response
- Publications
- TREATMENT & EQUIPMENT SALES
Tanker Loading Rack, Fall Protection & Secondary Containment Design
Location: Atlanta, Georgia
Client: Major Petroleum Company
Contract Amount: $80,00

Tanker Loading Rack Design & Construction Management for Lubricant Manufacturing Plant

Loading Rack Under Construction
TANKER LOADING RACK PROBLEM
A lubricant formulating plant engaged Remtech for a Tanker Loading Rack with Fall Protection and secondary containment design, installation, and construction mangement. Tasks included design, permitting, secondary containment, moving underground transfer lines into secondary containment concrete trenches, providing construction management, and installing an oil/water separator to treat stormwater from the tank farm. Remtech also prepared SPCC and FRP plans and trained plant personnel.
TANKER LOADING RACK SOLUTION
The lubricant facility purchased a pre-fabricated loading rack and new oil/water separator that were too large for the small plant site. Remtech had to obtain building offset variances from the City and Architectural Review Boards. Remtech attended public hearings to gain local acceptance of the proposed design modifications and variances.
Three dimensional modeling was performed to provide adequate tanker turning radiuses, clearances for tanker undercarriages with rollover spill containment/clean stormwater diversion transitions, and level tankers to align with two hydraulically operated gantries. Rollover spill containment transitions also diverted clean stormwater around loading rack operation contact areas.
An above ground stormwater detention basin (placed under the backside of the rack canopy) was designed to satisfy permitting requirements and fit within the limited space. Remtech also designed safety and fire prevention systems that were required to obtained permits from local fire authorities.
Remtech designed a concrete trench with metal H20 load grates crossing the plant entrance road to move existing underground transfer lines into a secondary containment structure draining to the canopy sump. An existing AST tank farm oil water separator (OWS) was modified to accept tank farm and loading rack contact water that was discharged to the sanitary sewer under an existing wastewater pretreatment permit. This replaced an $80,000 in ground oil/water separator that was originally planned by the client.
A SPCC plan was prepared and FRP plan updated and plant personal were trained by Remtech
TANKER LOADING RACK COST/BENEFITS
This structure could not have been built without variances obtained by Remtech through the public hearing and City review and permitting process. Remtech saved the client the cost of a new underground $80,000 OWS that would have required a larger stormwater detention facility due to additional land disturbance areas. Due to limited space on this site, a permit most likely could not have obtained with additional space requirements of an in ground OWS.