Division of SET Environmental
10,000 Environmental Remediations Since 1975
24 Hr Emergency Response
800-377-3648
| Contact Us | Careers | Employees
- HOME
- About Us
- Services
- Environmental Remediation Services
- Remediation Engineering Contracting
- Emergency Spill Response & Cleanup
- Disaster Response
- Industrial Vacuum Truck & Emergency Recovery Services
- Tank Cleaning & Industrial Services
- Waste Management & Disposal
- Mobile Wastewater & Remediation Systems
- Stormwater Basin Management & Inspections
- Environmental Engineering Services
- Groundwater & Soil Remediation
- Asbestos & Mold Remediation
- Mercury Remediation
- Chemical Fixation & Solidification
- Combustible Dust Cleanup & Hazard Analysis
- Metal Dust Cleaning & Hazard Analysis
- Homeless Encampment Cleanups
- PFAS Treatment Systems
- Lead Paint Abatement
- OSHA and EPA Training
- Sewer Jetting VACUJET and Inspection Services
- Spill Prevention & Secondary Containment
- Loading Rack Fall Protection, Walkways & Catwalks
- Renewable Energy Engineering
- Demolition & Site Restoration
- Bioremediation
- Bioremediation Optimization Primer
- Biopile Optimization Primer
- Bioremediation Accelerator HC-2000
- Bioremediation White Paper
- Bioremediation Degradation Curves
- Bioremediation Efficacy Testing
- Biorediation Toxicity Testing
- Diesel Bioremediation with Dual Phase Extraction
- Bioremedation of River Bank Jet Fuel
- Bioremediation of Gasoline in Wetland
- Biosparge of Solvent Site
- Bioremediation of Airport Jet Fuel Spill
- Detention Pond Diesel Bioremediation
- Bioremediation of Diesel on Mainline Track
- Bioremediation of Diesel Track Collision Site
- Bioremediation At-Grade Collison Site
- Bioremediation of Waste Oil
- Bioremediation of Transformer Oil
- Industries Served
- Case Histories
- Temporary Food Wastewater Treatment Plant
- Landfill Leachate Treatment Plant Design
- Diesel Fuel Dual Phase Extraction
- Gasoline Remediation in Fractured Rock
- Chlordane Superfund Site Remediation
- Agricultural Chemical Fire Response and Remediation
- PFAS Mobile Treatment Systems
- PFAS Treatment at Chemical Plant Fire
- Leaking Fuel Pipeline Remediation
- Spill Prevention at Railyards
- Railcar Loading RacK Design
- Leaking Chlorine Railcar Capped
- Chlorine Dioxide Explosion Remediation
- Vacujet Heavy Solids Sewer Cleaning
- Clemical Plant Fire Response and Remediation
- Train Fire Investigation
- Arsenic Building Site Remediation
- Chemical Fixation of Carpet Latex Sludge
- Power Center Fuel Remediation
- Power Plant Transformer Fire Remediation
- Transformer Explosion Remediation
- Mercury Hydroelectric Plant Remediation
- Decontamination of Abandoned Hospital
- Toluene Diisocyanate Remediation
- Loading RacK Tanker Unloading Design
- UST Tank Failure Investigation
- Gasoline Tanker Fire Emergency Response
- Publications
- TREATMENT & EQUIPMENT SALES
Gasoline Tanker Fire Emergency Response & Remediation
Location: Central Georgia
Client: Major Transportation Company
Contract Amount: $45,000

Gasoline Tanker Explosion & Fire

HC-2000 Applied to Gasoline Runoff During Residual Fuel Transfer
GASOLINE TANKER FIRE PROBLEM
A gasoline tanker (carrying approximately 7,800 gallons of unleaded gasoline) traveling on a highway in central Georgia overturned, struck a power pole, and exploded near a water main. The driver was injured and a youth was thrown from the tractor cab and died at the scene. The fire burned for approximately two hours and could be seen for two miles. The local fire department controlled the spread of the fire with water and foam before it was extinguished by an airport crash ruck. The transportation company engaged Remtech Engineers to remediate the incident.
TANKER FIRE REMEDIATION SOLUTION
Fuel remaining in the rear compartments was too hot to transfer (150oF) eleven hours after the fire was extinguished. The front compartment contained 2,500 gallons of fuel, which was cool enough to transfer. A “spark proof” tap was cut to insert a drop tube into the tanker shell to transfer the fuel. 2,300 pounds of ice were placed in the rear compartments to reduce fuel core temperatures to facilitate transfer of the remaining 1,000 gallons of fuel with an air diaphragm pump.
The incident occurred over a PVC water main. Concern was expressed by regulatory officials regarding the potential for gasoline migration/adsorption through the PVC into the water line. The water main was uncovered and no free product was observed next to the line. A six-inch horizontal perforated lance was installed next to main to facilitate air and HC-2000 injection to break down petroleum hydrocarbons. A sampling grid was established to determine the horizontal and vertical extent of contamination migration. Soils were
predominately SANDY and BTEX migrated through the vadose zone and into the groundwater. A site remediation plan was prepared and presented to the client that consisted of enhanced bioremediation employing Remtech’s proprietary native enzyme accelerator HC-2000 and proprietary delivery system.