Division of SET Environmental
10,000 Environmental Remediations Since 1975
24 Hr Emergency Response
800-377-3648
| Contact Us | Careers | Employees
- HOME
- About Us
- Services
- Environmental Remediation Services
- Remediation Engineering Contracting
- Emergency Spill Response & Cleanup
- Disaster Response
- Industrial Vacuum Truck & Emergency Recovery Services
- Tank Cleaning & Industrial Services
- Waste Management & Disposal
- Mobile Wastewater & Remediation Systems
- Stormwater Basin Management & Inspections
- Environmental Engineering Services
- Groundwater & Soil Remediation
- Asbestos & Mold Remediation
- Mercury Remediation
- Chemical Fixation & Solidification
- Combustible Dust Cleanup & Hazard Analysis
- Metal Dust Cleaning & Hazard Analysis
- Homeless Encampment Cleanups
- PFAS Treatment Systems
- Lead Paint Abatement
- OSHA and EPA Training
- Sewer Jetting VACUJET and Inspection Services
- Spill Prevention & Secondary Containment
- Loading Rack Fall Protection, Walkways & Catwalks
- Renewable Energy Engineering
- Demolition & Site Restoration
- Bioremediation
- Bioremediation Optimization Primer
- Biopile Optimization Primer
- Bioremediation Accelerator HC-2000
- Bioremediation White Paper
- Bioremediation Degradation Curves
- Bioremediation Efficacy Testing
- Biorediation Toxicity Testing
- Diesel Bioremediation with Dual Phase Extraction
- Bioremedation of River Bank Jet Fuel
- Bioremediation of Gasoline in Wetland
- Biosparge of Solvent Site
- Bioremediation of Airport Jet Fuel Spill
- Detention Pond Diesel Bioremediation
- Bioremediation of Diesel on Mainline Track
- Bioremediation of Diesel Track Collision Site
- Bioremediation At-Grade Collison Site
- Bioremediation of Waste Oil
- Bioremediation of Transformer Oil
- Industries Served
- Case Histories
- Temporary Food Wastewater Treatment Plant
- Landfill Leachate Treatment Plant Design
- Diesel Fuel Dual Phase Extraction
- Gasoline Remediation in Fractured Rock
- Chlordane Superfund Site Remediation
- Agricultural Chemical Fire Response and Remediation
- PFAS Mobile Treatment Systems
- PFAS Treatment at Chemical Plant Fire
- Leaking Fuel Pipeline Remediation
- Spill Prevention at Railyards
- Railcar Loading RacK Design
- Leaking Chlorine Railcar Capped
- Chlorine Dioxide Explosion Remediation
- Vacujet Heavy Solids Sewer Cleaning
- Clemical Plant Fire Response and Remediation
- Train Fire Investigation
- Arsenic Building Site Remediation
- Chemical Fixation of Carpet Latex Sludge
- Power Center Fuel Remediation
- Power Plant Transformer Fire Remediation
- Transformer Explosion Remediation
- Mercury Hydroelectric Plant Remediation
- Decontamination of Abandoned Hospital
- Toluene Diisocyanate Remediation
- Loading RacK Tanker Unloading Design
- UST Tank Failure Investigation
- Gasoline Tanker Fire Emergency Response
- Publications
- TREATMENT & EQUIPMENT SALES
Diesel Dual Phase Vacuum Extraction
Location: Atlanta, Georgia
Client: Major Bus Company
Contract Amount: $850,000

Diesel Dual Phase Extraction PID Drawing
UST DIESEL RELEASE PROBLEM
Remtech was engaged by a major bus terminal to remediate an estimated 7,000 gallon diesel fuel release from a twenty thousand gallon (20,000) underground storage tank. The 0.33-acre plume of fuel was located with 33 monitoring wells under a bus wash/service building and parking lot. Remtech secured reimbursement from the State’s Leaking Underground Trust Fund for this project.
UST DIESEL RELEASE REMEDIATION SOLUTION
Seventeen (17) recovery wells were installed following removal of the leaking UST. A Remtech dual-phase vacuum extraction system was installed that consisted of a rotary claw blower, knockout tank, oil/water separator (OWS), multimedia pre-filters and activated carbon post-filters. This project was complicated by tight clay soils (conductivity of 6.3 x 10-6 cm/sec) and iron bacteria floc that created a biofilm that clogged filtration systems.
Dissolved air floatation (DAF) and calcium chloride coagulation/ flocculation were added to the oversized OWS to assist with the separation of fuel from the bio-floc. For every gallon of fuel recovered, 1/3rd gallon of fuel entrained iron bacteria sludge had to be removed. Sludge entrained fuel was separated by placing solids in sludge thickening tanks with extended retention times. This was one of the worst iron bacteria fowling problems encountered in the State of Georgia.
IIron bacteria buildup in the wells required well rehabilitation with surge blocks, jetting, hydrochloric acid, calcium hypochlorite, hydrogen peroxide, citric acid, glycolic acid, and HC-2000 injection. 48.44% of the free product was removed during the first four (4) years of operation of the dual phase extraction system.
To accelerate the completion of this remediation project, approval was received from the State to inject Remtech's proprietary HC-2000 bioremediation accelerator and desorption agent. 92.63% of the remaining free product was removed with seven (7) injections of HC-2000 during the final year of the treatment program. The small quantity of free product remaining was determined to be immobile, stable, with no impacted downstream receptors.
An estimated 2,300 gallons of fuel were recovered over a five year period (not including bioremediated fractions of free product). This project was completed as a low risk site and a No Further Action Letter was received from the State UST Program.
UST DIESEL RELEASE REMEDIATION COST/BENEFITS
Project costs were completed for approximately $159/cy even with the unusual elevated iron bacteria biomass which accounted for over 30% of project costs. The client was reimbursed for this project by the State GUST Fund.