Division of SET Environmental
10,000 Environmental Remediations Since 1975
24 Hr Emergency Response
800-377-3648
| Contact Us | Careers | Employees
- HOME
- About Us
- Services
- Environmental Remediation Services
- Remediation Engineering Contracting
- Emergency Spill Response & Cleanup
- Disaster Response
- Industrial Vacuum Truck & Emergency Recovery Services
- Tank Cleaning & Industrial Services
- Waste Management & Disposal
- Mobile Wastewater & Remediation Systems
- Stormwater Basin Management & Inspections
- Environmental Engineering Services
- Groundwater & Soil Remediation
- Asbestos & Mold Remediation
- Mercury Remediation
- Chemical Fixation & Solidification
- Combustible Dust Cleanup & Hazard Analysis
- Metal Dust Cleaning & Hazard Analysis
- Homeless Encampment Cleanups
- PFAS Treatment Systems
- Lead Paint Abatement
- OSHA and EPA Training
- Sewer Jetting VACUJET and Inspection Services
- Spill Prevention & Secondary Containment
- Loading Rack Fall Protection, Walkways & Catwalks
- Renewable Energy Engineering
- Demolition & Site Restoration
- Bioremediation
- Bioremediation Optimization Primer
- Biopile Optimization Primer
- Bioremediation Accelerator HC-2000
- Bioremediation White Paper
- Bioremediation Degradation Curves
- Bioremediation Efficacy Testing
- Biorediation Toxicity Testing
- Diesel Bioremediation with Dual Phase Extraction
- Bioremedation of River Bank Jet Fuel
- Bioremediation of Gasoline in Wetland
- Biosparge of Solvent Site
- Bioremediation of Airport Jet Fuel Spill
- Detention Pond Diesel Bioremediation
- Bioremediation of Diesel on Mainline Track
- Bioremediation of Diesel Track Collision Site
- Bioremediation At-Grade Collison Site
- Bioremediation of Waste Oil
- Bioremediation of Transformer Oil
- Industries Served
- Case Histories
- Temporary Food Wastewater Treatment Plant
- Landfill Leachate Treatment Plant Design
- Diesel Fuel Dual Phase Extraction
- Gasoline Remediation in Fractured Rock
- Chlordane Superfund Site Remediation
- Agricultural Chemical Fire Response and Remediation
- PFAS Mobile Treatment Systems
- PFAS Treatment at Chemical Plant Fire
- Leaking Fuel Pipeline Remediation
- Spill Prevention at Railyards
- Railcar Loading RacK Design
- Leaking Chlorine Railcar Capped
- Chlorine Dioxide Explosion Remediation
- Vacujet Heavy Solids Sewer Cleaning
- Clemical Plant Fire Response and Remediation
- Train Fire Investigation
- Arsenic Building Site Remediation
- Chemical Fixation of Carpet Latex Sludge
- Power Center Fuel Remediation
- Power Plant Transformer Fire Remediation
- Transformer Explosion Remediation
- Mercury Hydroelectric Plant Remediation
- Decontamination of Abandoned Hospital
- Toluene Diisocyanate Remediation
- Loading RacK Tanker Unloading Design
- UST Tank Failure Investigation
- Gasoline Tanker Fire Emergency Response
- Publications
- TREATMENT & EQUIPMENT SALES
CHEMICAL PLANT FIRE RESPONSE AND REMEDIATION
Location: Northern Georgia
Client: Speciality Chemical Company
Contract Amount: $330,000

Chemical Plant Fire Response & Remediation
Chemical Plant Fire Remediation Problem
Remtech responded to a chemical plant fire containing aromatic and chlorinated solvents and propellants. Remtech's scope of work was to remove hazardous materials and collect and/or treat contaminated stormwater in a detention pond. Remtech developed a site safety plan and conducted environmental health monitoring.
Bulk storage tanks, totes, drums, secondary containment structures, overhead pipe racks, processing equipment, pollution control systems, and buildings were involved in the fire. Fire runoff water that collected in a heavily vegetated detention pond was also treated with an activated carbon filter placed in the pond discharge. Fire fighting runoff water consisted of ash, water, scums, partially burn fire and chemical residues, and soluble phase contaminants. Containment and treatment of fire runoff water in the pond was urgent due to impending rainfall that would discharge into waters of the State.
Containment and Stormwater Rerouting
Stormwater from roofs and non-impacted parts of the site were routed around the burn site with 4" PVC piping and swales.
Plant Containment Structures
The burn area was isolated and plant site contaminated stormwater was pumped into multiple frac tanks that were loaded into tankers and disposed of at a hazardous waste facility over a three month period. Existing secondary containment valves were closed and walls were enhanced to contain product from leaking ASTs. Plugs were placed in leaking product lines. Straw filtration barriers, carbon filters already in place at stormwater drop inlets were monitored and replaced as necessary. Magnetic drain stops were also used to stop stormwater discharges to the detention pond.
Pond Containment & Treatment Structures
River boom and an in-situ granular activated carbon filtration structure was installed immediately up-gradient from the concrete outfall. Soluble organics were filtered through an in-situ granular filtration bed constructed at the concrete outfall with booms, poly sorbent, and skimmers placed immediately upstream to prevent floating materials from clogging filter media. Millions of gallons of stormwater were filtered through an in-situ carbon filter
Floating scums and resins were herded off the pond with booms, floating wash down pumps, and collected on banks. Scums were solidified with bank soils and placed in super sacks for disposal.
Collection, Packaging and Treatment of Plant Chemicals
Concentrated liquid burn residues inside containment structures and ASTs were pumped into frac tanks, tankers, totes, and drums. Product from partially burnt above ground storage tanks were pumped with explosion proof air driven diaphragm pumps with remote lances preventing confined space entry.
Chemical Fire Remediation Assets
Remtech assets utilized on this project included: excavation equipment, frac tanks, 1,000 ft of river boom, rapid deployment boom/boat trailer, hazmat trailer, emergency lighting, skimmers, vacuum trucks, tankers, carbon filters, explosion proof blowers, explosion proof pumps, compressors, PPE, environmental monitoring equipment, straw filtration barriers, polypropylene sorbent, drums, totes, and super sacks.
Chemical Fire Response Cost/Benefits
Remtech's in-situ carbon filtration system installed in the overflow structure of the downgradient detention pond treated several million gallons of contaminated stormwater and saved several hundred thousand dollars in treatment costs.