Division of SET Environmental
10,000 Environmental Remediations Since 1975
24 Hr Emergency Response
800-377-3648
| Contact Us | Careers | Employees
- HOME
- About Us
- Services
- Environmental Remediation Services
- Remediation Engineering Contracting
- Emergency Spill Response & Cleanup
- Disaster Response
- Industrial Vacuum Truck & Emergency Recovery Services
- Tank Cleaning & Industrial Services
- Waste Management & Disposal
- Mobile Wastewater & Remediation Systems
- Stormwater Basin Management & Inspections
- Environmental Engineering Services
- Groundwater & Soil Remediation
- Asbestos & Mold Remediation
- Mercury Remediation
- Chemical Fixation & Solidification
- Combustible Dust Cleanup & Hazard Analysis
- Metal Dust Cleaning & Hazard Analysis
- Homeless Encampment Cleanups
- PFAS Treatment Systems
- Lead Paint Abatement
- OSHA and EPA Training
- Sewer Jetting VACUJET and Inspection Services
- Spill Prevention & Secondary Containment
- Loading Rack Fall Protection, Walkways & Catwalks
- Renewable Energy Engineering
- Demolition & Site Restoration
- Bioremediation
- Bioremediation Optimization Primer
- Biopile Optimization Primer
- Bioremediation Accelerator HC-2000
- Bioremediation White Paper
- Bioremediation Degradation Curves
- Bioremediation Efficacy Testing
- Biorediation Toxicity Testing
- Diesel Bioremediation with Dual Phase Extraction
- Bioremedation of River Bank Jet Fuel
- Bioremediation of Gasoline in Wetland
- Biosparge of Solvent Site
- Bioremediation of Airport Jet Fuel Spill
- Detention Pond Diesel Bioremediation
- Bioremediation of Diesel on Mainline Track
- Bioremediation of Diesel Track Collision Site
- Bioremediation At-Grade Collison Site
- Bioremediation of Waste Oil
- Bioremediation of Transformer Oil
- Industries Served
- Case Histories
- Temporary Food Wastewater Treatment Plant
- Landfill Leachate Treatment Plant Design
- Diesel Fuel Dual Phase Extraction
- Gasoline Remediation in Fractured Rock
- Chlordane Superfund Site Remediation
- Agricultural Chemical Fire Response and Remediation
- PFAS Mobile Treatment Systems
- PFAS Treatment at Chemical Plant Fire
- Leaking Fuel Pipeline Remediation
- Spill Prevention at Railyards
- Railcar Loading RacK Design
- Leaking Chlorine Railcar Capped
- Chlorine Dioxide Explosion Remediation
- Vacujet Heavy Solids Sewer Cleaning
- Clemical Plant Fire Response and Remediation
- Train Fire Investigation
- Arsenic Building Site Remediation
- Chemical Fixation of Carpet Latex Sludge
- Power Center Fuel Remediation
- Power Plant Transformer Fire Remediation
- Transformer Explosion Remediation
- Mercury Hydroelectric Plant Remediation
- Decontamination of Abandoned Hospital
- Toluene Diisocyanate Remediation
- Loading RacK Tanker Unloading Design
- UST Tank Failure Investigation
- Gasoline Tanker Fire Emergency Response
- Publications
- TREATMENT & EQUIPMENT SALES
CHLORINE DIOXIDE EXPLOSION REMEDIATION
Location: Northwestern Georgia
Client: Major Water Treatment Authority
Contract Amount: $84,000

Dechlorination of Chlorine Dioxide with Sodium Metabisulfite and Soda Ash in Ice Bath

Chlorine Dioxide Explosion

Municipal Water Treatment Chlorination Facility
CHLORINE DIOXIDE EXPLOSION PROBLEM
Remtech was retained by a major water treatment authority to cleanup and determine the cause of a chlorine dioxide explosion which occurred at a raw water pumping station. Shock sensitive sodium chlorite burn residues remained in the building.
CHLORINE DIOXIDE EXPLOSION SOLUTION
A remediation plan was prepared to deactivate the reactor residues while keeping chlorine and chlorine dioxide ambient concentrations below detection limits. Bench-scale reactions were conducted to confirm full-scale reactions.
Forty gallons of burn residues were reacted with 200 pounds of soda ash and 100 pounds of sodium metabisulfite. Heat of reaction energy
was dissipated by placing 150 pounds of cubed ice in the reactors.
Reactions were conducted in closed poly reactors. Off gasses were collected and passed through two gas scrubbers with a soda ash/
sodium metabisulfite solution. Off gasses were monitored to ensure that no chlorine or chlorine dioxide was liberated from the reaction.
The temperature of the reaction vessels was monitored to keep temperatures below 120o F. Over two (2) tons of residual sodium chlorite were reacted.
The walls and floor were cleaned with a hot pressure washer. Wash water was collected and processed through the dechlorination reactors. Plastic components left a residue on the ceilings, glass block walls, and concrete floor. These residues were removed with caustic and acid cleaners.
CHLORINE DIOXIDE EXPLOSION REMEDIATION COST/BENEFITS
Remtech prepared an engineering report delineating the cause of the fire. A short in a PLC controller panel for a motorized control valve initiated a fire.
This report allowed the insurance company for the water utility to secure reimbursement (several hundred thousand dollars) from the
chlorine dioxide manufacturer’s insurance company.