Division of SET Environmental
10,000 Environmental Remediations Since 1975
24 Hr Emergency Response
800-377-3648
| Contact Us | Careers | Employees
- HOME
- About Us
- Services
- Environmental Remediation Services
- Remediation Engineering Contracting
- Emergency Spill Response & Cleanup
- Disaster Response
- Industrial Vacuum Truck & Emergency Recovery Services
- Tank Cleaning & Industrial Services
- Waste Management & Disposal
- Mobile Wastewater & Remediation Systems
- Stormwater Basin Management & Inspections
- Environmental Engineering Services
- Groundwater & Soil Remediation
- Asbestos & Mold Remediation
- Mercury Remediation
- Chemical Fixation & Solidification
- Combustible Dust Cleanup & Hazard Analysis
- Metal Dust Cleaning & Hazard Analysis
- Homeless Encampment Cleanups
- PFAS Treatment Systems
- Lead Paint Abatement
- OSHA and EPA Training
- Sewer Jetting VACUJET and Inspection Services
- Spill Prevention & Secondary Containment
- Loading Rack Fall Protection, Walkways & Catwalks
- Renewable Energy Engineering
- Demolition & Site Restoration
- Bioremediation
- Bioremediation Optimization Primer
- Biopile Optimization Primer
- Bioremediation Accelerator HC-2000
- Bioremediation White Paper
- Bioremediation Degradation Curves
- Bioremediation Efficacy Testing
- Biorediation Toxicity Testing
- Diesel Bioremediation with Dual Phase Extraction
- Bioremedation of River Bank Jet Fuel
- Bioremediation of Gasoline in Wetland
- Biosparge of Solvent Site
- Bioremediation of Airport Jet Fuel Spill
- Detention Pond Diesel Bioremediation
- Bioremediation of Diesel on Mainline Track
- Bioremediation of Diesel Track Collision Site
- Bioremediation At-Grade Collison Site
- Bioremediation of Waste Oil
- Bioremediation of Transformer Oil
- Industries Served
- Case Histories
- Temporary Food Wastewater Treatment Plant
- Landfill Leachate Treatment Plant Design
- Diesel Fuel Dual Phase Extraction
- Gasoline Remediation in Fractured Rock
- Chlordane Superfund Site Remediation
- Agricultural Chemical Fire Response and Remediation
- PFAS Mobile Treatment Systems
- PFAS Treatment at Chemical Plant Fire
- Leaking Fuel Pipeline Remediation
- Spill Prevention at Railyards
- Railcar Loading RacK Design
- Leaking Chlorine Railcar Capped
- Chlorine Dioxide Explosion Remediation
- Vacujet Heavy Solids Sewer Cleaning
- Clemical Plant Fire Response and Remediation
- Train Fire Investigation
- Arsenic Building Site Remediation
- Chemical Fixation of Carpet Latex Sludge
- Power Center Fuel Remediation
- Power Plant Transformer Fire Remediation
- Transformer Explosion Remediation
- Mercury Hydroelectric Plant Remediation
- Decontamination of Abandoned Hospital
- Toluene Diisocyanate Remediation
- Loading RacK Tanker Unloading Design
- UST Tank Failure Investigation
- Gasoline Tanker Fire Emergency Response
- Publications
- TREATMENT & EQUIPMENT SALES
CHLORDANE SUPERFUND SITE REMEDIATION
Location: Central Illinois
Client: Major Chemical Company
Contract Amount:$3,200,000

Chlordane Sludge Stream Superfund Site Remediation
CHLORDANE SUPERFUND PROBLEM:
Chlordane fugitive dust and leachates from a major chlordane manufacturing facility in Central Illinois contaminated a 3-mile stream segment that also contained historical municipal sludge deposits from a local wastewater treatment plant. This created a gelatinous low viscosity matrix that could not be removed using conventional methods.
A five foot wide by 3.1 mile long chlordane/sludge deposit was initially estimated by the Chemical company. Clogged culverts in farm field access roads caused contamination to migrate up stream banks that greatly increased inpacted soil estimates. Remtech's principals conducted pilot tests and prepared a site remediation plan that was approved by the State of Illinois.
CHLORDANE REMEDIATION SOLUTION:
Pozzolanic Portland Cement fixation dewatered the gelatinous matrix that allowed excavation with Gradalls and Priestman excavators with 60 ft reaches. Over 20,000 tons of sludges were dewatered and dried on stream banks (that served as inclined dewatering beds). Dried residues were loaded into over 1,000 dump trucks for disposal at a State designated hazardous waste disposal site.
Pozzolanic Chemical fixation was conducted in 1,000 ft sections by constructing containment dams and diverting stormwater around each segment with 6" centrifugal pumps and PVC piping. This prevented flooding of town facilities. Stormwater passed through a large detention pond where it was clarified and filtered through mobile diatomaceous filters for discharge downstream.
Chlordane remediation performance sampling was conducted that met State cleanup standards.
Remediation tasks are summarized below:
➣ Prepared remedial action plan design
➣ Prepared project work plan
➣ Prepared project safety and QA/QC plans
➣ Prepared community relations plan
➣ Conducted preliminary RI/FS
➣ Completed endangerment assessment
➣ Assessment defines cleanup standard
➣ Implemented turnkey remediation program
➣ Employees created Chlordane garden concentrations