Division of SET Environmental
10,000 Environmental Remediations Since 1975
24 Hr Emergency Response
800-377-3648
| Contact Us | Careers | Employees
- HOME
- About Us
- Services
- Environmental Remediation Services
- Remediation Engineering Contracting
- Emergency Spill Response & Cleanup
- Disaster Response
- Industrial Vacuum Truck & Emergency Recovery Services
- Tank Cleaning & Industrial Services
- Waste Management & Disposal
- Mobile Wastewater & Remediation Systems
- Stormwater Basin Management & Inspections
- Environmental Engineering Services
- Groundwater & Soil Remediation
- Asbestos & Mold Remediation
- Mercury Remediation
- Chemical Fixation & Solidification
- Combustible Dust Cleanup & Hazard Analysis
- Metal Dust Cleaning & Hazard Analysis
- Homeless Encampment Cleanups
- PFAS Treatment Systems
- Lead Paint Abatement
- OSHA and EPA Training
- Sewer Jetting VACUJET and Inspection Services
- Spill Prevention & Secondary Containment
- Loading Rack Fall Protection, Walkways & Catwalks
- Renewable Energy Engineering
- Demolition & Site Restoration
- Bioremediation
- Bioremediation Optimization Primer
- Biopile Optimization Primer
- Bioremediation Accelerator HC-2000
- Bioremediation White Paper
- Bioremediation Degradation Curves
- Bioremediation Efficacy Testing
- Biorediation Toxicity Testing
- Diesel Bioremediation with Dual Phase Extraction
- Bioremedation of River Bank Jet Fuel
- Bioremediation of Gasoline in Wetland
- Biosparge of Solvent Site
- Bioremediation of Airport Jet Fuel Spill
- Detention Pond Diesel Bioremediation
- Bioremediation of Diesel on Mainline Track
- Bioremediation of Diesel Track Collision Site
- Bioremediation At-Grade Collison Site
- Bioremediation of Waste Oil
- Bioremediation of Transformer Oil
- Industries Served
- Case Histories
- Temporary Food Wastewater Treatment Plant
- Landfill Leachate Treatment Plant Design
- Diesel Fuel Dual Phase Extraction
- Gasoline Remediation in Fractured Rock
- Chlordane Superfund Site Remediation
- Agricultural Chemical Fire Response and Remediation
- PFAS Mobile Treatment Systems
- PFAS Treatment at Chemical Plant Fire
- Leaking Fuel Pipeline Remediation
- Spill Prevention at Railyards
- Railcar Loading RacK Design
- Leaking Chlorine Railcar Capped
- Chlorine Dioxide Explosion Remediation
- Vacujet Heavy Solids Sewer Cleaning
- Clemical Plant Fire Response and Remediation
- Train Fire Investigation
- Arsenic Building Site Remediation
- Chemical Fixation of Carpet Latex Sludge
- Power Center Fuel Remediation
- Power Plant Transformer Fire Remediation
- Transformer Explosion Remediation
- Mercury Hydroelectric Plant Remediation
- Decontamination of Abandoned Hospital
- Toluene Diisocyanate Remediation
- Loading RacK Tanker Unloading Design
- UST Tank Failure Investigation
- Gasoline Tanker Fire Emergency Response
- Publications
- TREATMENT & EQUIPMENT SALES
Arsenic Remediation During County Water Service Building Construction
Location: Atlanta, Georgia
Client: County Government
Contract Amount: $170,000

County Water Service Building Arsenic Soil Contamination Remediation
ARSENIC SOIL CONTAMINATION PROBLEM
A County purchased one of the oldest historical foundry and machining manufacturing sites (11.2 acres) in Georgia for the development of a county water services complex. A Phase I Environmental Assessment was conducted by a private consulting firm who reported no environmental risks. A second firm engaged by the County identified significant environmental hazards/risks and recommended supplemental investigations.
Construction contracts were let and demolition commenced before additional investigations were conducted. Multiple explosions and fires ensued and construction was halted.
FOUNDRY ARSENIC REMEDIATION SOLUTION
Remtech Engineers was authorized to mitigate and identify explosives and other hazardous material. The explosive material was determined to be calcium carbide formerly used to generate acetylene.
Remtech’s authorization was expanded to assist the County Board of Commissioners with completing a Phase II and III Environmental Assessment. A myriad of environmental issues were successfully addressed that resulted in completion of the project with minimal contractor delays.
Remtech prepared and implemented a site remediation plan which addressed several complex factors:
• Identification of hazardous materials & unknowns
• Disposal of hazardous materials and wastes
• Onsite destruction of unstable/explosive compounds
• Recovery of recyclable materials
• Background arsenic in soils linked to Appalachia coal
• Worked with ATF to identify suspect civil war ordnance
• Soil & groundwater sampling
• Identification & remediation of underground tankage
• Site remediation coordinated with construction activities
• Provided protective gear and conducted industrial hygiene monitoring of construction workers
• Capped site & controlled arsenic exposure pathways during and following construction
FOUNDRY ARSENIC REMEDIATION COST/BENEFITS
Prepared HSRA notification & mitigation within 30-day period. Prevented site from being listed on State hazardous waste inventory. Provided personnel protective equipment and environmental monitoring of contractor personnel during construction activities. Completed remedial activities in a couple of weeks. Building construction completed with existing contractor with minimal delays.