Division of SET Environmental
10,000 Environmental Remediations Since 1975
24 Hr Emergency Response
800-377-3648
| Contact Us | Careers | Employees
- HOME
- About Us
- Services
- Environmental Remediation Services
- Remediation Engineering Contracting
- Emergency Spill Response & Cleanup
- Disaster Response
- Industrial Vacuum Truck & Emergency Recovery Services
- Tank Cleaning & Industrial Services
- Waste Management & Disposal
- Mobile Wastewater & Remediation Systems
- Stormwater Basin Management & Inspections
- Environmental Engineering Services
- Groundwater & Soil Remediation
- Asbestos & Mold Remediation
- Mercury Remediation
- Chemical Fixation & Solidification
- Combustible Dust Cleanup & Hazard Analysis
- Metal Dust Cleaning & Hazard Analysis
- Homeless Encampment Cleanups
- PFAS Treatment Systems
- Lead Paint Abatement
- OSHA and EPA Training
- Sewer Jetting VACUJET and Inspection Services
- Spill Prevention & Secondary Containment
- Loading Rack Fall Protection, Walkways & Catwalks
- Renewable Energy Engineering
- Demolition & Site Restoration
- Bioremediation
- Bioremediation Optimization Primer
- Biopile Optimization Primer
- Bioremediation Accelerator HC-2000
- Bioremediation White Paper
- Bioremediation Degradation Curves
- Bioremediation Efficacy Testing
- Biorediation Toxicity Testing
- Diesel Bioremediation with Dual Phase Extraction
- Bioremedation of River Bank Jet Fuel
- Bioremediation of Gasoline in Wetland
- Biosparge of Solvent Site
- Bioremediation of Airport Jet Fuel Spill
- Detention Pond Diesel Bioremediation
- Bioremediation of Diesel on Mainline Track
- Bioremediation of Diesel Track Collision Site
- Bioremediation At-Grade Collison Site
- Bioremediation of Waste Oil
- Bioremediation of Transformer Oil
- Industries Served
- Case Histories
- Temporary Food Wastewater Treatment Plant
- Landfill Leachate Treatment Plant Design
- Diesel Fuel Dual Phase Extraction
- Gasoline Remediation in Fractured Rock
- Chlordane Superfund Site Remediation
- Agricultural Chemical Fire Response and Remediation
- PFAS Mobile Treatment Systems
- PFAS Treatment at Chemical Plant Fire
- Leaking Fuel Pipeline Remediation
- Spill Prevention at Railyards
- Railcar Loading RacK Design
- Leaking Chlorine Railcar Capped
- Chlorine Dioxide Explosion Remediation
- Vacujet Heavy Solids Sewer Cleaning
- Clemical Plant Fire Response and Remediation
- Train Fire Investigation
- Arsenic Building Site Remediation
- Chemical Fixation of Carpet Latex Sludge
- Power Center Fuel Remediation
- Power Plant Transformer Fire Remediation
- Transformer Explosion Remediation
- Mercury Hydroelectric Plant Remediation
- Decontamination of Abandoned Hospital
- Toluene Diisocyanate Remediation
- Loading RacK Tanker Unloading Design
- UST Tank Failure Investigation
- Gasoline Tanker Fire Emergency Response
- Publications
- TREATMENT & EQUIPMENT SALES
Diesel Bioremediation of At-Grade Collision Site
Location: South Georgia
Client: Major Railroad
Contract Amount: $65,000
(50% of Costs Associated with
Water Well within 500 ft from release)

Appliction of HC-2000 to 175 ft of Diesel Contaminated Track Ballast

Completed Site
DIESEL SPILL ON TRACK SIDING PROBLEM
An at-grade crossing collision on a track siding with a train and fuel truck released over 1,000-gallons of diesel fuel over a track distance of 175 feet.
TRACK SIDING DIESEL BIOREMEDIATION SOLUTION
The fuel saturated asphalt road and sub-grade were removed and replaced. An initial application of HC-2000 and water were used to flush the mobile phase out of the ballast. A total of twelve (12) applications of HC-2000 (205 gallons) were made over a twelve (12) month period. Degradation monitoring continued for a total of 14 months.
A water well was located less than 500 ft downgradient from the release. A monitoring well was installed immediately downgradient from the tracks to ensure that the water well was not impacted. No contaminates were detected in the water well. Groundwater Polycyclic Aromatic Hydrocarbons (PAHs), BTEX, and (DROs) were degraded below detection limits in the monitoring well.
Diesel Range Organics (DRO) ballast/soil concentrations were reduced by an average of 96.5%.
TRACK SIDING DIESEL BIOREMEDIATION COST/BENEFITS
The track ballast was treated without taking the track out of service and saved the railroad thousands of dollars in saved track time alone. 50% of the costs associated with this project was due to demonstrating that this release did not impact the well.