Division of SET Environmental
10,000 Environmental Remediations Since 1975
24 Hr Emergency Response
800-377-3648
| Contact Us | Careers | Employees
- HOME
- About Us
- Services
- Environmental Remediation Services
- Remediation Engineering Contracting
- Emergency Spill Response & Cleanup
- Disaster Response
- Industrial Vacuum Truck & Emergency Recovery Services
- Tank Cleaning & Industrial Services
- Waste Management & Disposal
- Mobile Wastewater & Remediation Systems
- Stormwater Basin Management & Inspections
- Environmental Engineering Services
- Groundwater & Soil Remediation
- Asbestos & Mold Remediation
- Mercury Remediation
- Chemical Fixation & Solidification
- Combustible Dust Cleanup & Hazard Analysis
- Metal Dust Cleaning & Hazard Analysis
- Homeless Encampment Cleanups
- PFAS Treatment Systems
- Lead Paint Abatement
- OSHA and EPA Training
- Sewer Jetting VACUJET and Inspection Services
- Spill Prevention & Secondary Containment
- Loading Rack Fall Protection, Walkways & Catwalks
- Renewable Energy Engineering
- Demolition & Site Restoration
- Bioremediation
- Bioremediation Optimization Primer
- Biopile Optimization Primer
- Bioremediation Accelerator HC-2000
- Bioremediation White Paper
- Bioremediation Degradation Curves
- Bioremediation Efficacy Testing
- Biorediation Toxicity Testing
- Diesel Bioremediation with Dual Phase Extraction
- Bioremedation of River Bank Jet Fuel
- Bioremediation of Gasoline in Wetland
- Biosparge of Solvent Site
- Bioremediation of Airport Jet Fuel Spill
- Detention Pond Diesel Bioremediation
- Bioremediation of Diesel on Mainline Track
- Bioremediation of Diesel Track Collision Site
- Bioremediation At-Grade Collison Site
- Bioremediation of Waste Oil
- Bioremediation of Transformer Oil
- Industries Served
- Case Histories
- Temporary Food Wastewater Treatment Plant
- Landfill Leachate Treatment Plant Design
- Diesel Fuel Dual Phase Extraction
- Gasoline Remediation in Fractured Rock
- Chlordane Superfund Site Remediation
- Agricultural Chemical Fire Response and Remediation
- PFAS Mobile Treatment Systems
- PFAS Treatment at Chemical Plant Fire
- Leaking Fuel Pipeline Remediation
- Spill Prevention at Railyards
- Railcar Loading RacK Design
- Leaking Chlorine Railcar Capped
- Chlorine Dioxide Explosion Remediation
- Vacujet Heavy Solids Sewer Cleaning
- Clemical Plant Fire Response and Remediation
- Train Fire Investigation
- Arsenic Building Site Remediation
- Chemical Fixation of Carpet Latex Sludge
- Power Center Fuel Remediation
- Power Plant Transformer Fire Remediation
- Transformer Explosion Remediation
- Mercury Hydroelectric Plant Remediation
- Decontamination of Abandoned Hospital
- Toluene Diisocyanate Remediation
- Loading RacK Tanker Unloading Design
- UST Tank Failure Investigation
- Gasoline Tanker Fire Emergency Response
- Publications
- TREATMENT & EQUIPMENT SALES
Bioremediation of Waste Oil on Railroad Tracks
Waste Oil Spill On Mainline Tracks
Location: Atlanta, Georgia
Client: Waste Oil Recycler
Contract Amount: $40,000

HC-2000 Application to Waste Oil Spill on Mainline Track following
Installation of Leachate Collection System
WASTE OIL SPILL PROBLEM
A waste oil recycler tanker spilled an estimated 600 gallons of waste oil that flowed through a storm drain and onto two main line tracks covering 140 ft of drainage ditch and 60 ft of track.
WASTE OIL BIOREMEDIATION SOLUTION
Regulatory/railroad cleanup criteria required no oil migration off the railroad ROW and no sheens in stormwater runoff. Six (6) cubic yards of oil saturated gravel/soil were excavated from the stormsewer outfall and ditch adjacent to the tracks. A poly sorbent/straw filtration/ containment system was installed in the drainage ditch. A leachate collection system was installed between the tracks that consisted of seventy (70) ft x 6” diameter HPDE drain pipe (terminating in a 20-gallon sump). A second leachate collection system was installed in the drainage ditch next to the bank.
Six (6) HC-2000 applications were made during a 4 month period. Leachate collection and filtration system maintenance & monitoring continued for an additional 8 month period until sheens in stormwater runoff and oil collection in the leachate collection systems dissipated.
WASTE OIL BIOREMEDIATION COST/BENEFITS
Cost savings to the railroad on this project were: Ballast removal/replacement estimate was $100,000 plus track service interruptions for 25 to 75 trains/day or an estimated $250,000/day.