Solvent Site Bioremediaiton with HC-2000 | Albany, NY


Location: Upstate New York

Client: Major Bottling Company

Contract Amount: $130,000


BioSparge Trailer at Solvent Site

BioSparge Trailer at Solvent Site


SOLVENT CONTAMINATION PROBLEM


Soil and groundwater under an 8,000 square foot building and paved parking lot was contaminated with chlorinated and non-chlorinated solvents. Remtech was engaged to manufacture a mobile treatment system ($65,000) to deliver its proprietary native bioremediation acceleration technology - HC-2000 at multiple bottling sites.


SOLVENT SITE BIOREMEDIATION SOLUTION


Remtech manufactured a mobile bioremediation trailer for the major beverage distribution company. This system is equipped with telemetry reporting and remote control. Remtech installed five air/enzyme injection wells and five vapor extraction wells to enhance treatment under the building and parking lot. Site geology consists of sandy CLAY and glacial till with a shallow groundwater (3 feet BLS). After 5.5 months of system operation, analyte concentrations were reduced: benzene - 100%, ethylbenzene - 100%, naphthalene - 95%, toluene 95%,1,2,4-trimethylbenzene - 97%, 1,3,5-Trimethylenzene 85%, and total xylenes - 98%.


SOLVENT SITE BIOREMEDIATION COST/BENEFITS


Remtech designed a mobile biosparge remediation system to work at multiple bottling company sites and successfully completed a remediation at their first site that would substantially reduce treatment system costs.