gasoline tanker fire response ©️Remtech Engineers

Division of SET Environmental


10,000 Environmental Remediations Since 1975

24 Hr Emergency Response

800-377-3648

Bioremediation of Gasoline in Wetland


Location:  South Georgia

Client:  Transportation Company/Georgia DNR

Contract Amount: $140,000


Operating BioFence in Wetland

Operating BioFence in Wetland

GASOLINE SPILL IN WETLAND PROBLEM


A gasoline tanker rolled over in a wetland area in Southern Georgia releasing an estimated 2,000 gallons. The gasoline plume migrated over a one acre area on a tree farmer’s property. Excavation was not an option due to unstable soils and an elevated groundwater table. The Georgia Department of Natural Resources had the transportation company contact Remtech Engineer’s to employ its proprietary native bioremediation accelerator HC-2000.


WETLAND GASOLINE BIOREMEDIATION SOLUTION


Three biofence reactors consisting of 30 HC2000 injection points and a sprinkling system were installed. HC2 was applied every two weeks followed by a one hour watering period.  HC2 migrated through the contaminated swamp media via passive dispersion between injection points and intervals. Groundwater and soil samples were collected and analyzed for TPH (GRO) and BTEX.


This project was completed in eighteen (18) week treatment period. Average site soil Gasoline Recoverable Organic concentrations were reduced 98.7% and average groundwater benzene concentrations reduced by over 84%.


WETLAND BIOREMEDIATION COST/BENEFITS


5,520 cy of contaminated media were treated for an estimated $25/cy. Remtech received a no further action letter from the Georgia Department of Natural Resources upon project completion.  No damage to site vegetation was observed.