gasoline tanker fire response ©️Remtech Engineers

Division of SET Environmental


10,000 Environmental Remediations Since 1975

24 Hr Emergency Response

800-377-3648

Bioremediation of Diesel Spill on Mainline Track


Location:  Northwestern Georgia

Client:  Major Railroad

Contract Amount:  $42,000


Application of HC-2000 on Diesel Fuel Spill on Mainline Track

Application of HC-2000 on Diesel Fuel Spill on Mainline Track


DIESEL FUEL SPILL ON MAINLINE TRACK PROBLEM


A locomotive caught fire on a major railroad’s super elevated mainline track. An estimated 100-gallons of diesel fuel were released along a 100 foot track section.


MAINLINE TRACK DIESEL BIOREMEDIATION SOLUTION


Remtech designed and installed a solar/battery powered mist system to supply oxygen and water during the remediation process to maintain a 75% water field holding capacity. Track ballast served as a biological trickling filter. HC-2000 was applied during the first three days of treatment followed by weekly HC-2000 applications to accelerate the native fungi and bacteria biodegradation process. Air sparge tips were driven into the ballast to increase oxygen levels. A solar powered battery driven compressor was utilized to supply air through the sparge tips.


Four (4) sampling points were monitored over an 118 day treatment period.  Average TPH concentrations were reduced 90%. TPH concentrations at the toe of ballast next to the drainage ditch was recorded at 18.5 mg/kg at the end of the project indicating that petroleum hydrocarbons were being degraded within the railroad ROW.


MAINLINE TRACK DIESEL BIOREMEDIATION COST/BENEFITS


Track time interruption to excavate and replace this mainline track section would have been cost-prohibitive.