Division of SET Environmental
10,000 Environmental Remediations Since 1975
24 Hr Emergency Response
800-377-3648
| Contact Us | Careers | Employees
- HOME
- About Us
- Services
- Environmental Remediation Services
- Remediation Engineering Contracting
- Emergency Spill Response & Cleanup
- Disaster Response
- Industrial Vacuum Truck & Emergency Recovery Services
- Tank Cleaning & Industrial Services
- Waste Management & Disposal
- Mobile Wastewater & Remediation Systems
- Stormwater Basin Management & Inspections
- Environmental Engineering Services
- Groundwater & Soil Remediation
- Asbestos & Mold Remediation
- Mercury Remediation
- Chemical Fixation & Solidification
- Combustible Dust Cleanup & Hazard Analysis
- Metal Dust Cleaning & Hazard Analysis
- Homeless Encampment Cleanups
- PFAS Treatment Systems
- Lead Paint Abatement
- OSHA and EPA Training
- Sewer Jetting VACUJET and Inspection Services
- Spill Prevention & Secondary Containment
- Loading Rack Fall Protection, Walkways & Catwalks
- Renewable Energy Engineering
- Demolition & Site Restoration
- Bioremediation
- Bioremediation Optimization Primer
- Biopile Optimization Primer
- Bioremediation Accelerator HC-2000
- Bioremediation White Paper
- Bioremediation Degradation Curves
- Bioremediation Efficacy Testing
- Biorediation Toxicity Testing
- Diesel Bioremediation with Dual Phase Extraction
- Bioremedation of River Bank Jet Fuel
- Bioremediation of Gasoline in Wetland
- Biosparge of Solvent Site
- Bioremediation of Airport Jet Fuel Spill
- Detention Pond Diesel Bioremediation
- Bioremediation of Diesel on Mainline Track
- Bioremediation of Diesel Track Collision Site
- Bioremediation At-Grade Collison Site
- Bioremediation of Waste Oil
- Bioremediation of Transformer Oil
- Industries Served
- Case Histories
- Temporary Food Wastewater Treatment Plant
- Landfill Leachate Treatment Plant Design
- Diesel Fuel Dual Phase Extraction
- Gasoline Remediation in Fractured Rock
- Chlordane Superfund Site Remediation
- Agricultural Chemical Fire Response and Remediation
- PFAS Mobile Treatment Systems
- PFAS Treatment at Chemical Plant Fire
- Leaking Fuel Pipeline Remediation
- Spill Prevention at Railyards
- Railcar Loading RacK Design
- Leaking Chlorine Railcar Capped
- Chlorine Dioxide Explosion Remediation
- Vacujet Heavy Solids Sewer Cleaning
- Clemical Plant Fire Response and Remediation
- Train Fire Investigation
- Arsenic Building Site Remediation
- Chemical Fixation of Carpet Latex Sludge
- Power Center Fuel Remediation
- Power Plant Transformer Fire Remediation
- Transformer Explosion Remediation
- Mercury Hydroelectric Plant Remediation
- Decontamination of Abandoned Hospital
- Toluene Diisocyanate Remediation
- Loading RacK Tanker Unloading Design
- UST Tank Failure Investigation
- Gasoline Tanker Fire Emergency Response
- Publications
- TREATMENT & EQUIPMENT SALES
Bioremediation of Diesel Spill on Mainline Track
Location: Northwestern Georgia
Client: Major Railroad
Contract Amount: $42,000

Application of HC-2000 on Diesel Fuel Spill on Mainline Track
DIESEL FUEL SPILL ON MAINLINE TRACK PROBLEM
A locomotive caught fire on a major railroad’s super elevated mainline track. An estimated 100-gallons of diesel fuel were released along a 100 foot track section.
MAINLINE TRACK DIESEL BIOREMEDIATION SOLUTION
Remtech designed and installed a solar/battery powered mist system to supply oxygen and water during the remediation process to maintain a 75% water field holding capacity. Track ballast served as a biological trickling filter. HC-2000 was applied during the first three days of treatment followed by weekly HC-2000 applications to accelerate the native fungi and bacteria biodegradation process. Air sparge tips were driven into the ballast to increase oxygen levels. A solar powered battery driven compressor was utilized to supply air through the sparge tips.
Four (4) sampling points were monitored over an 118 day treatment period. Average TPH concentrations were reduced 90%. TPH concentrations at the toe of ballast next to the drainage ditch was recorded at 18.5 mg/kg at the end of the project indicating that petroleum hydrocarbons were being degraded within the railroad ROW.
MAINLINE TRACK DIESEL BIOREMEDIATION COST/BENEFITS
Track time interruption to excavate and replace this mainline track section would have been cost-prohibitive.