Division of SET Environmental
10,000 Environmental Remediations Since 1975
24 Hr Emergency Response
800-377-3648
| Contact Us | Careers | Employees
- HOME
- About Us
- Services
- Environmental Remediation Services
- Remediation Engineering Contracting
- Emergency Spill Response & Cleanup
- Disaster Response
- Industrial Vacuum Truck & Emergency Recovery Services
- Tank Cleaning & Industrial Services
- Waste Management & Disposal
- Mobile Wastewater & Remediation Systems
- Stormwater Basin Management & Inspections
- Environmental Engineering Services
- Groundwater & Soil Remediation
- Asbestos & Mold Remediation
- Mercury Remediation
- Chemical Fixation & Solidification
- Combustible Dust Cleanup & Hazard Analysis
- Metal Dust Cleaning & Hazard Analysis
- Homeless Encampment Cleanups
- PFAS Treatment Systems
- Lead Paint Abatement
- OSHA and EPA Training
- Sewer Jetting VACUJET and Inspection Services
- Spill Prevention & Secondary Containment
- Loading Rack Fall Protection, Walkways & Catwalks
- Renewable Energy Engineering
- Demolition & Site Restoration
- Bioremediation
- Bioremediation Optimization Primer
- Biopile Optimization Primer
- Bioremediation Accelerator HC-2000
- Bioremediation White Paper
- Bioremediation Degradation Curves
- Bioremediation Efficacy Testing
- Biorediation Toxicity Testing
- Diesel Bioremediation with Dual Phase Extraction
- Bioremedation of River Bank Jet Fuel
- Bioremediation of Gasoline in Wetland
- Biosparge of Solvent Site
- Bioremediation of Airport Jet Fuel Spill
- Detention Pond Diesel Bioremediation
- Bioremediation of Diesel on Mainline Track
- Bioremediation of Diesel Track Collision Site
- Bioremediation At-Grade Collison Site
- Bioremediation of Waste Oil
- Bioremediation of Transformer Oil
- Industries Served
- Case Histories
- Temporary Food Wastewater Treatment Plant
- Landfill Leachate Treatment Plant Design
- Diesel Fuel Dual Phase Extraction
- Gasoline Remediation in Fractured Rock
- Chlordane Superfund Site Remediation
- Agricultural Chemical Fire Response and Remediation
- PFAS Mobile Treatment Systems
- PFAS Treatment at Chemical Plant Fire
- Leaking Fuel Pipeline Remediation
- Spill Prevention at Railyards
- Railcar Loading RacK Design
- Leaking Chlorine Railcar Capped
- Chlorine Dioxide Explosion Remediation
- Vacujet Heavy Solids Sewer Cleaning
- Clemical Plant Fire Response and Remediation
- Train Fire Investigation
- Arsenic Building Site Remediation
- Chemical Fixation of Carpet Latex Sludge
- Power Center Fuel Remediation
- Power Plant Transformer Fire Remediation
- Transformer Explosion Remediation
- Mercury Hydroelectric Plant Remediation
- Decontamination of Abandoned Hospital
- Toluene Diisocyanate Remediation
- Loading RacK Tanker Unloading Design
- UST Tank Failure Investigation
- Gasoline Tanker Fire Emergency Response
- Publications
- TREATMENT & EQUIPMENT SALES
Bioremediation of Airport Jet Fuel Spill
Location: Atlanta, Georgia
Client: International Airport
Contract Amount: Confidential

Jet Fuel Bioremedation Bed at International Airport
AIRPORT JET FUEL SPILL PROBLEM
The drive train on a tanker carrying 10,000 gallons of Jet A exploded and punctured the shell releasing 8,000 gallons of fuel on a perimeter road at an International Airport. The site was located in a restricted area in direct line with aircraft approach runways.
Fuel was released on asphalt pavement and migrated overland and 1-mile downstream into airport drainage ditches, tunnels, and a creek. The airport authority required that a remedial approach with minimal equipment access and visual disturbances to approaching aircraft be implemented.
AIRPORT JET FUEL REMEDIATION SOLUTION
Approximately 6,500 gallons of fuel were recovered from a one mile section of stream utilizing skimmers, vacuum trucks, wash down pumps, and a polypropylene rope mop.
An estimated 1,000 gallons of fuel saturated 600 cubic yards of soils at the release point. 350 cubic yards of soils were excavated from the bottom of the drainage ditch and placed on a one foot deep biobed. Soils were cultivated with a disc/harrow. The remaining 250 cubic yards of soil were treated in the bank (insitu) employing three (3) horizontal aeration manifolds powered by a regenerative blower. Ten (10) gallons of HC-2000 (diluted with 16 volumes of water) were applied on a weekly basis to the bank and bed bioremediation systems. A sprinkler system was installed to maintain moisture levels at both locations.
Total petroleum hydrocarbon (TPH) concentrations were reduced below 200 mg/kg in 16 weeks (99% reduction). Total heterotrophic plate counts were elevated from 6,000,000 to over 100,000,000 CFU/gm.
AIRPORT JET FUEL REMEDIATION COST/BENEFITS
Remtech trained airport personal to maintain the bioremediation systems and reduce project costs. Remediating soils onsite with HC-2000 minimized the number of site access and resident time that met airport authority security and aircraft safety requirements.