Division of SET Environmental
10,000 Environmental Remediations Since 1975
24 Hr Emergency Response
800-377-3648
| Contact Us | Careers | Employees
- HOME
- About Us
- Services
- Environmental Remediation Services
- Remediation Engineering Contracting
- Emergency Spill Response & Cleanup
- Disaster Response
- Industrial Vacuum Truck & Emergency Recovery Services
- Tank Cleaning & Industrial Services
- Waste Management & Disposal
- Mobile Wastewater & Remediation Systems
- Stormwater Basin Management & Inspections
- Environmental Engineering Services
- Groundwater & Soil Remediation
- Asbestos & Mold Remediation
- Mercury Remediation
- Chemical Fixation & Solidification
- Combustible Dust Cleanup & Hazard Analysis
- Metal Dust Cleaning & Hazard Analysis
- Homeless Encampment Cleanups
- PFAS Treatment Systems
- Lead Paint Abatement
- OSHA and EPA Training
- Sewer Jetting VACUJET and Inspection Services
- Spill Prevention & Secondary Containment
- Loading Rack Fall Protection, Walkways & Catwalks
- Renewable Energy Engineering
- Demolition & Site Restoration
- Bioremediation
- Bioremediation Optimization Primer
- Biopile Optimization Primer
- Bioremediation Accelerator HC-2000
- Bioremediation White Paper
- Bioremediation Degradation Curves
- Bioremediation Efficacy Testing
- Biorediation Toxicity Testing
- Diesel Bioremediation with Dual Phase Extraction
- Bioremedation of River Bank Jet Fuel
- Bioremediation of Gasoline in Wetland
- Biosparge of Solvent Site
- Bioremediation of Airport Jet Fuel Spill
- Detention Pond Diesel Bioremediation
- Bioremediation of Diesel on Mainline Track
- Bioremediation of Diesel Track Collision Site
- Bioremediation At-Grade Collison Site
- Bioremediation of Waste Oil
- Bioremediation of Transformer Oil
- Industries Served
- Case Histories
- Temporary Food Wastewater Treatment Plant
- Landfill Leachate Treatment Plant Design
- Diesel Fuel Dual Phase Extraction
- Gasoline Remediation in Fractured Rock
- Chlordane Superfund Site Remediation
- Agricultural Chemical Fire Response and Remediation
- PFAS Mobile Treatment Systems
- PFAS Treatment at Chemical Plant Fire
- Leaking Fuel Pipeline Remediation
- Spill Prevention at Railyards
- Railcar Loading RacK Design
- Leaking Chlorine Railcar Capped
- Chlorine Dioxide Explosion Remediation
- Vacujet Heavy Solids Sewer Cleaning
- Clemical Plant Fire Response and Remediation
- Train Fire Investigation
- Arsenic Building Site Remediation
- Chemical Fixation of Carpet Latex Sludge
- Power Center Fuel Remediation
- Power Plant Transformer Fire Remediation
- Transformer Explosion Remediation
- Mercury Hydroelectric Plant Remediation
- Decontamination of Abandoned Hospital
- Toluene Diisocyanate Remediation
- Loading RacK Tanker Unloading Design
- UST Tank Failure Investigation
- Gasoline Tanker Fire Emergency Response
- Publications
- TREATMENT & EQUIPMENT SALES
Bioremediation of Jet Fuel in River Bank
Location: Atlanta, Georgia
Client: Major Tank Line/Insurance Company
Contract Amount: $430,000

Bioremediation of Jet Fuel in River Bank
JET FUEL RIVER BANK CONTAMINATION PROBLEM
A tanker carrying 8,000 gallons of JP-4 on a major interstate highway rolled down an embankment releasing 2,600 gallons of jet fuel into a wetlands area adjacent to a stream feeding a major recreational lake in North Atlanta. The spill site was immediately adjacent to a golf course. Remtech was engaged by the insurance company to remediate the site.
JP-4 BIOREMEDIATION SOLUTION
Remtech installed a series of interceptor trenches to collect free product. The interceptor trenches were also designed to serve as insitu bio-foam reactors. HC-2000 (a native microorganism bioremediation accelerator) was applied to enhance the biodegradation of jet fuel in the vadose (soil) and saturated (groundwater) zones.
During the first month of operation, 700 gallons of free product were recovered from the interceptor trenches (using recovery well pumps) and from an oxbow using a polypropylene rope mop. Leachates were pumped to Remtech’s treatment system consisting of an oil/water separator, twin LPAS (Low-Profile Air Strippers), and aqueous phase activated carbon filter.
Next surface and groundwater HC-2000 injection was initiated. The interceptor trenches were utilized to sparge the groundwater and generate bio-foam and to elevate groundwater dissolved oxygen levels from 0.5 mg/l to over 3.5 mg/l. Total groundwater heterotrophic plate counts increased from 10,000 CFUs/ml to over 1,000,000 CFUs/ml during the first month of BioSparging. Solution phase total petroleum hydrocarbons (TPH via EPA method 418.1) were reduced by over 83% during the first 30 days of treatment and soil TPH concentrations were reduced by over 70% during the first 30 days of treatment.
Over a four month period, soil TPH concentrations were reduced over 91% and groundwater TPH concentrations by over 94%. Benzene groundwater concentrations were reduced from 125 ppb to below detection limits. No rebound in groundwater benzene concentrations occurred six (6) years later.
COST/BENEFITS OF JP-4 BIOREMEDIATION
HC-2000 biostimulation was selected over other remedial strategies due to limited site access and significant cost savings over other methods, i.e. less than 50% of site excavation and restoration costs.
Approximately 5,000 cy of contaminated media were treated for $86/cy. By treating this site in place, traffic interruptions from hauling hundreds of loads onto the interstate and site erosion was avoided. Downstream erosion claims were proven to be from urban development that pre-existed the commencement of this project.