PROBLEM
A gasoline contaminated site at a beverage distribution facility with leaking underground storage tanks was qualified by Remtech for reimbursement under the State GUST Trust Fund.
SOLUTION
The USTs were removed and a bioventing/biosparge system was installed. Seven (7) existing recovery wells were converted into HC-2000 injection bio-foam wells. Remtech’s HC-2000 (natural bioremediation accelerator) was injected over a six (6) month period.
Remtech’s bio-foam injection wells were utilized to increase mass transport of HC-2000 to the saturated and unsaturated zones. High pressure air is used to generate foam micro bubbles. High volume/low pressure air was used to move the foam blanket through the unsaturated zone and capillary
fringe.
COST/BENEFITS
Remtech qualified this site for reimbursement under the State GUST Trust Fund.
Bio-Foam Injection Well
HC-2000 Biosparge Wells
INDUSTRIAL SERVICES
industrial cleaning & maintenance
VACUUM TRUCK SERVICES
high-rail vacuum truck servics
ENVIRONMENTAL CONSULTING
REMTECH SERVICES
200 Cobb Parkway North
Suite 208
Marietta, Georgia 30062
Phone: 770-427-7766 or 800-377-3648 Fax: 770-427-7001
Copyright Remtech Engineers, 2018