shopify
site analytics
acetic acid plant explosion
anhydrous ammonia training power plan
pipeline leak vacuum extraction
pipeline leak location, cleanup, and repair
latex pond chemical fixation and conversion to parking lot
superfund site groundwater treatment plant

24 Hr Emergency Response

800-377-3648

(placeholder)
(placeholder)

4,000 Environmental Remediations Since 1988

Remtech © 2017

HC-2000 Reduces Odors at Soy Protein & Decaying Organics at Derailment Site

Web Inquiries: 770-427-7766 Extension 4

Fax: 770-427-7001

Email: webmaster@remtech-eng.com

Copyright Remtech Engineers, 2017

Remtech EngineersTM

200 Cobb Parkway North

Suite 208

Marietta, Georgia 30062

Phone: 770-427-7766 or 800-377-3648

(placeholder)
(placeholder)

REMTECH SERVICES

(placeholder)

Decaying Organics Odors Controled with HC-2000, Powdered Activated Carbon & Lime

Location:  Northwestern Georgia

Client:  Major Railroad

Contract Amount:  $40,000


PROBLEM

Remtech was engaged by a railroad to remediate a derailment site where soy protein, flour, and rice had been released.  Organics began to decay liberating offensive odors to residents and leachates threatened a nearby stream.  


SOLUTION

The following remedial action was implemented by Remtech Engineers:









COST/BENEFITS

Nuisance odors were reduced and avoided further residential complaints.

Decaying Soy Product Excavated and Placed in Covered BioPile
Decaying Organic Leachated Treated with
Activated Carbon
Decaying Soy Derailment SIte
Decaying Organics Odors Controled with HC-2000, Powdered Activated Carbon & Lime

Decaying Organic Leachated Treated with

Activated Carbon

Decaying Soy Product Excavated and Placed in Covered BioPile

Decaying Soy Derailment SIte

  • P︎umped 1,000 gallons of leachate from a pool and treated with two granular activated carbon filters in series and released to stormwater ditch.
  • Excavated 470 tons of pond sediment, soil, and ballast and staged in biopile on north end of site. Straw bales were placed on downgradient side for erosion control and the pile was covered with plastic.
  • Treated approximately one-acre of residual soils with powdered activated carbon and HC-2000. Odors and flies were dramatically reduced following the completion of excavation operations and application of the odor control agents. The area was also treated with powdered agricultural lime to further reduce odors.
  • A decision was made by the railroad to dispose of the biopile material rather than degrade on site to avoid potential residential complaints. Twenty-nine truck loads were hauled from the site and disposed at a landfill.