Project Case History

Accelerated JP-8 Enzyme Bioremediation

Client: Major Tank Line/Insurance Company

Location: Atlanta, Georgia

Contract Amount: Confidential

 

A tanker carrying 8,000 gallons of JP-8 on a major interstate highway rolled down an embankment releasing 2,600 gallons of jet fuel into a wetlands area adjacent to a stream feeding a major recreational lake in North Atlanta.

 

The fuel infiltrated a marshy environment and migrated into a underground gravel stream bed. Remtech was engaged by the insurance company to remediate the site.

 

Remtech installed a series of interceptor trenches to collect free product. The interceptor trenches were also designed to serve as biosparge and biovent systems. HC-2000 (a native microorganism bioremediation accelerator) was applied to enhance the biodegradation of jet fuel in the vadose (soil) and saturated (groundwater) zones.

 

During the first month of operation, 700 gallons of free product were recovered from the interceptor trenches (using recovery well pumps) and oxbow using a polypropylene rope mop. Leachates were pumped to a Remtech treatment system consisting of an oil/water separator, twin LPAS (Low-Profile Air Strippers), and aqueous phase activated carbon filter.

 

Following removal of the mobile free product phase, surface and groundwater enzyme injection was initiated. The interceptor trenches were utilized to sparge the groundwater to elevate groundwater dissolved oxygen levels from 0.5 mg/l to over 3.5 mg/l. Total groundwater heterotrophic plate counts increased from 10,000 CFUs/ml to over 1,000,000 CFUs/ml during the first month of BioSparging. Solution phase total petroleum hydrocarbons (TPH via EPA method 418.1) were reduced by over 83% during the first 30 days of treatment and soil TPH concentrations were reduced by over 70% during the first 30 days of treatment.

 

Over a 4 month period, soil TPH concentrations were reduced over 91% and groundwater TPH concentrations by over 94%. Benzene groundwater concentrations were reduced from 125 ppb to below detection limits.

 

Insitu enhanced bioremediation was selected over other remedial strategies due to limited site access and significant cost savings over other methods, i.e. less than 50% of site excavation and restoration costs.

JP-8 Tanker Accident Site

 

 

 

 


Remtech Leachate & BioSparge Treatment Plant

 


Remtech EngineersTM


200 North Cobb Parkway                     Site Remediation Specialists
Building 200, Suite 208
Marietta, GA 30062
Phone: 770-427-7766  -or-  800-377-3648
Web Inquiries: Extension 204
Fax: 770-427-7001
Email: postmaster@remtech-eng.com
©    Copyright Remtech Engineers, 1998
TM  Remtech is a registered trademark. All rights reserved